SMCL prepares to take over Chunaikhola dolomite mine
It was found that the area has reserve of 592.692 million MT up to an elevation level of 420m. Considering 15 to 20 percent average increase in annual mine production from 2018 with mine production rate of around 3 million MT of dolomite, the deposit is expected to last 169 years based on the geological reserve.